Home » Shop » hot sale » Flowline Switch-Tek LO10 Optic Leak Detection Switch – PP, 10′ Cable, 3/4″ NPT, NEMA 6

Flowline Switch-Tek LO10 Optic Leak Detection Switch – PP, 10′ Cable, 3/4″ NPT, NEMA 6

Original price was: $62.40.Current price is: $41.29.

Sale!
SKU: ARX53727307395 Category:

The Flowline Switch-Tek LO10 is a general purpose optic liquid leak detection switch providing reliable point level detection with a single SPST relay output. The PP or PFA housing and NEMA 6 (IP68) rating make it ideal for water and translucent chemical leak detection. Mounts via 3/4″ NPT with cable termination. Rated -40F to 176F and up to 150 PSI.

Key Specifications

  • SKU: LO10-1305
  • Configuration: PP, 10′ Cable, 3/4″ NPT, NEMA 6
  • Mount: 3/4″ NPT
  • Technology: Optic

PVC Fittings Online is an authorized Flowline distributor. Contact our team for application support, volume pricing, and technical assistance.